BPC for material train issued for ………… period.
-
A.
30 days
-
B.
15 days
-
C.
28 days
-
D.
04 days
Correct Answer:
A. 30 days
Explanation:
The Brake Power Certificate (BPC) for a material train is valid for a period of 30 days. This certificate ensures that the train's braking system is functional and safe for operation. After the 30-day duration expires, the rake must undergo a fresh examination to obtain a new certificate, ensuring continuous adherence to safety standards during engineering and maintenance works.