POH of BVZI is to be done every ________ years.
-
A.
04.
-
B.
05.
-
C.
03
-
D.
02
Correct Answer:
D. 02
Explanation:
The Periodic Overhauling (POH) for BVZI brake vans is a mandatory maintenance procedure required to maintain safety and performance standards on the railway. According to standard technical specifications for these 8-wheeled goods brake vans, the POH is scheduled every 2 years. Conducting regular overhauling within this specific timeframe ensures that all critical mechanical components remain in optimal working condition for safe transit operations.