Study the following statement and choose right answer from the options given below : The distance between station ‘A’ and station ‘B’ is 12 km. Recently, 3 Nos., Auto-Signals were commissioned in between. Now, as a Section Controller, answer the following questions :-
You came to know that the train in the Auto Signal section stalled due to OHE failure. What action you will take to clear the section ?
-
A.
Stop the train movement over the section and discuss with TLC for requirement of Tower Car or Diesel loco for section clearance.
-
B.
Instruct Passing Trains Crew to detach their Diesel Power and attach to the stalled train and clear section.
-
C.
Send Tower Car to rectify the trouble.
-
D.
None of these
Correct Answer:
A. Stop the train movement over the section and discuss with TLC for requirement of Tower Car or Diesel loco for section clearance.
Explanation:
In the event of a train stalling in an automatic signaling section due to an Overhead Equipment (OHE) failure, the immediate priority for a Section Controller is to ensure safety and organize recovery. Since the train cannot move under its own power and the power supply is compromised, all train movements within the affected section must be halted to prevent further complications. The controller should coordinate with the Traction Loco Controller (TLC) to evaluate the situation and arrange for assistance, such as a diesel locomotive or a Tower Car, to clear the stalled train from the section and restore normal operations.
Click below to open Discussion & Feedback
0 Issues
Please