The wagon Turn Round is measured in terms of……………….
-
A.
Weeks
-
B.
Months
-
C.
Days
-
D.
Years
Correct Answer:
C. Days
Explanation:
Wagon Turnaround Time (WTT) is a key performance indicator in railway logistics that measures the average duration between two consecutive loadings of a wagon. It represents the efficiency of wagon utilization and is primarily expressed in Days. This metric tracks the entire cycle, including loading, transit, unloading, and the time taken to return for the next load. Reducing this timeframe indicates a more efficient dispatch and transport operation.